Smooth process, sleek result

Last month, the new IKC De Wijssel building in Gendringen was completed. SMT Bouw & Vastgoed from 's-Hertogenbosch was responsible for the design and construction. They chose to collaborate with our co-makers. ‘Thanks to previous successful projects and good experiences with Wiggers, we knew that they could take care of everything for us,’ says Cas van de Put, Engineer at SMT Bouw & Vastgoed.

7 Referentie IKC De Wijsel

Technically well-designed reveal trim system as a basis

The basis of the collaboration was the supply of window sill mouldings. These come from our EcoProfiel range and are finished with a white foil. Cas: "The system is technically well thought out and therefore beneficial for us: the cabling can be neatly concealed behind the mouldings, the plasterwork takes less time to dry, and the finish is easy to keep clean. We therefore use the window sill mouldings as window sills. This provides the desired simplicity and contributes to the sleek result.”

Customisation and assembly

SMT Bouw & Vastgoed created its own design. We contributed ideas to help achieve a good standard in production. During assembly, we then customised all the edges.
Cas: "To ensure a good connection with the sand-lime brick, the co-makers at Wiggers measured the lengths at random. They ordered extra length for this purpose. They customised and assembled everything on site. That customisation was a matter of course for us and ensured the best result." Additional requirements also arose during the project, such as covering the ceiling around the stairwell and providing a neatly finished casing for the underfloor heating. We contributed ideas and delivered solutions that seamlessly integrated with the design.

Products used in this reference

The power of Wiggers

Thanks to an excellent collaboration with our customers, we know and understand your challenges. This enables us to deliver solutions that perfectly match your needs and projects. Always ready for installation. Because we have moved the work from the construction site to our factory. This saves production steps, manpower and waste on location.